ایمیل: linda@662n.com تلفن همراه: +8613924100039 (WhatsAPP)
Wechat: airspringG Skype: guomat
| محل منبع: | گوانگدونگ ، چین |
| نام تجاری: | GUOMAT |
| گواهی: | ISO/TS16949:2009 |
| شماره مدل: | 1B200-10 |
| مقدار حداقل تعداد سفارش: | 6 عدد |
|---|---|
| قیمت: | $49.9-59.9/pc |
| جزئیات بسته بندی: | جعبه کارتن قوی یا همانطور که مشتریان نیاز دارند |
| زمان تحویل: | 2-8 روز کاری |
| شرایط پرداخت: | T/T ، Western Union ، L/C |
| قابلیت ارائه: | 1000 قطعه در هفته |
| مادی: | لاستیک و فولاد | ضمانت: | 12 ماه |
|---|---|---|---|
| عمل: | شوک را کاهش دهید | شماره زیر: | 1B12 |
| ققنوس: | SP1B12 / SP1B12-1 | سنگ فرش: | W01-M58-6374 |
| اتصالات هوا: | G3/4 | پیچیدن: | M8X1.25 |
| برجسته کردن: | Phoenix industrial air spring,Contitech rubber air spring,G3/4 gas-filled air spring,Contitech rubber air spring,G3/4 gas-filled air spring |
||
| Parameter | Value |
|---|---|
| Top Cover Plate Diameter | 160mm |
| Bottom Cover Plate Diameter | 160mm |
| Gas Hole / Air inlet | G3/4 |
| Rubber Bellows Natural Diameter | 220mm |
| The Working Stroke | MAX 180 mm to MIN 57 mm |
| Top Cover Plate Screw (Nut) Tooth | 2XM8X1.25 |
| Bottom Cover Plate Screw (Nut) Tooth | 2XM8X1.25 |
| Screw Center Distance of Top Cover Plate | 89mm |
| Distance From Screw to Air Hole | 38mm |
| Screw Center Distance of Bottom Cover Plate | 89mm |
| Step | Core Action | Key Point |
|---|---|---|
| 1. Prepare | Power off and disconnect water. Use a jack to lift each corner of the machine one at a time. Remove the old feet. | Safety first! Only lift one corner at a time and secure it with blocks. |
| 2. Install | Position the air springs. Use bolts to secure the top end firmly to the machine's base. | The bottom end usually just needs to sit flat on the floor. |
| 3. Connect | Use air hoses to connect the air inlets of all four air springs in a series. | This ensures equal air pressure across the system. |
| 4. Level | Inflate the springs slowly and remove the jack. Use a spirit level and adjust air pressure until the machine is perfectly level. | This is the most critical step for vibration reduction. |
| 5. Test | Inflate to the specified pressure. Run a high-speed spin cycle first empty, then with load, to check for stability. | Once set, no further adjustment is needed for normal operation. |
تماس با شخص: Sunny
تلفن: 18928788039